1005 Street elevation Piering
Description: Street level has been raised after sub-division entry sign was constructed.

Solution: Steel piers are installed to raise the entire structure to the desired level.

 

Before

105-1.jpg (7072 bytes)

The structure needed to be lifted over five feet from it's original elevation.

During

105-2.jpg (9045 bytes)

105-4.jpg (7452 bytes)

Steel piers are installed to lift the structure all at the same time

After

105-3.jpg (6221 bytes)

Upon completion the entry wall is now at the same level as the new road.