|
Case
Studies

| Case Study |
Description |
Application |
| 1005 |
Street elevation |
Piering |
Description: Street level has
been raised after sub-division entry sign was constructed.Solution:
Steel piers are installed to raise the entire structure to the
desired level.
Before

The structure needed to be lifted over five feet from it's original
elevation.
During


Steel piers are installed to lift the structure all at the same time
After

Upon completion the entry wall is now at the same level as the new road.
[Top]
|